Rizhao Shanghai Port Center Project
发布于:2024-1-28 点击:9 属于:Concrete production |

The raft slab of the Rizhao Shanghai Port Center project is poured with large volume concrete, with concrete grade C45 and a one-time pouring volume of 7718 cubic meters. Due to site limitations, two concrete transport pumps were continuously poured on site for about 72 hours.
上一个:in-plant
下一个:暂无